1. Reviewing Architectural Drawings
We start by examining your latest construction and interior plans — focusing on elevations, floor layouts, and common area schematics.
This allows us to confirm all sign types, placements, and quantities before production.
2. Verifying ADA & Regulatory Details
Our compliance specialists cross-check every ADA-related element, including tactile lettering, Braille placement, and mounting heights.
We make sure the entire signage system meets federal and local accessibility codes, avoiding costly revisions later.
3. Brand & Material Alignment
Your signage should reflect your property’s identity.
We review brand colors, finishes, and typography to ensure each sign complements the building’s design intent while maintaining functionality and contrast requirements.
4. Coordination with GC & Design Teams
We coordinate with your general contractor, architect, and interior designer to resolve any conflicts between drawings, finishes, and installation feasibility.
This helps keep the signage schedule aligned with the overall project timeline.
Deliverables
After the review, you’ll receive a finalized documentation set that includes:
- Updated sign schedule and locations
- Any design adjustments for ADA or constructability
- Material and finish confirmations
- Fabrication-ready design package
Why This Step Matters
- Accuracy Before Fabrication: Prevents rework and ensures all details are correct before production.
- ADA Verified: Every sign is reviewed for compliance.
- Aligned Teams: Architects, designers, and contractors are all on the same page.
- Brand Consistency: Maintains visual harmony across the entire property.
Ready for Review?
If your project already has design intent drawings, send them over — we’ll take it from there.
Our goal is to ensure that your vision is buildable, compliant, and beautifully executed.
📞 Schedule a Review | ✉️ info@mawbra.io

